Product Overview
We are Exporting, Manufacturing and Supplying a best collection of EPOXY COATING (HYB) in Chennai that is a two part high solids solvent free epoxy phenolic resin based coating system designed for hard wearing, smooth surface finish for floors, walls and on steel structures. FEATURES: Hard Wearing Non Dusting Excellent Surface Finish Non Smelling Good Aesthetics Highly Chemical Resistant AREA OF APPLICATION: Stir well before mixing Part A and Part B and mix in the prescribed ratio Apply one coat of EPOXY primer on the clean and dry surface EPOXY COATING (HYB) should be applied on the surface by brush or roller within 24 hrs. After application of primer coat it should be allowed to air dry for min. 4 hrs. Preferable in a dust free atmosphere Apply min. 2 coats with the intercoat interval of 6-8 hrs PRODUCTS SPECIFICATION: Application:Brush, Roller Mixing Ratio:As Directed on Packing Pot Life:30 Mins. Drying Time:Touch Dry- 30 Min, Hard Dry 6 Hrs. Intercoat Interval:6-8 Hrs. Min. Dry Film Thickness:125-150 Microns/per coat depending on porosity Covering Capacity :6-8 sq.met/kg per coat depending on porosity, roughness & method of application. Color Shades:All Standard Shades RECOMMENDED USES: Food & Pharmaceutical Work Shop Clean Room Application Chemical Resistant Coating for Concrete& Steel Chemical Resistant Coating for Concrete& Steel
Contact Person
No. 34-A, Rajiv Gandhi Salai, Thanthai Periyar Nagar, Alwarthiru Nagar,
We are Exporting, Manufacturing and Supplying a best collection of EPOXY COATING (HYB) in Chennai that is a two part high solids solvent free epoxy phenolic resin based coating system designed for hard wearing, smooth surface finish for floors, walls and on steel structures. FEATURES: Hard Wearing Non Dusting Excellent Surface Finish Non Smelling Good Aesthetics Highly Chemical Resistant AREA OF APPLICATION: Stir well before mixing Part A and Part B and mix in the prescribed ratio Apply one coat of EPOXY primer on the clean and dry surface EPOXY COATING (HYB) should be applied on the surface by brush or roller within 24 hrs. After application of primer coat it should be allowed to air dry for min. 4 hrs. Preferable in a dust free atmosphere Apply min. 2 coats with the intercoat interval of 6-8 hrs PRODUCTS SPECIFICATION: Application:Brush, Roller Mixing Ratio:As Directed on Packing Pot Life:30 Mins. Drying Time:Touch Dry- 30 Min, Hard Dry 6 Hrs. Intercoat Interval:6-8 Hrs. Min. Dry Film Thickness:125-150 Microns/per coat depending on porosity Covering Capacity :6-8 sq.met/kg per coat depending on porosity, roughness & method of application. Color Shades:All Standard Shades RECOMMENDED USES: Food & Pharmaceutical Work Shop Clean Room Application Chemical Resistant Coating for Concrete& Steel Chemical Resistant Coating for Concrete& Steel